City Electrical Factors (CEF) IT and Marketing Office, Durham, UK

  • Type de bâtiment:
  • Office Buildings
Plein écran Fermer Street view

For the new CEF Date, IT and Marketing Centre the architects Faulkner Brown wanted a “technologically cutting-edge building”

A kit of parts approach was taken and 90nr DELTABEAM®s were incorporated into the design along with Peikko Column Shoes & Anchor bolts. DELTABEAM® Composite Beams providing a slim floor and flat soffit also interfaced with precast floor units which incorporated combined heating & cooling system, creating a Thermally Active Building System (TABS). The frame was delivered the 11-week contractual period.

The new CEF headquarters also secured the 2019 RIBA Northeast Building of the Year Award.

Lire la suite down-arrow.png

Détails du Projet

Taille du projet:
2100 m2
Étages:
2
Développeur:
CEF Ltd
Entreprise de construction:
PCE Ltd
Designer structurel:
Curtins
Architect:
FaulknerBrowns
Année de réalisation:
2016
Année de livraison:
2017

Parlez avec nos experts

Michael Scott

Michael Scott

Sales Manager, Deltabeam Products

England & Wales

Tel. +44 1325 318619
Mob. +44 755 7118470
[email protected]