Community Facility of Jamsil Jinju Apartment, Songpa-gu, Seoul, South Korea

  • Type de bâtiment:
  • Retail Buildings
Plein écran Fermer

This project applied a dry joint system to the stair core of the community facility within the apartment complex.

The construction-stage analysis was divided into three phases: after core element installation and before grout curing, after grout curing, and finally the stage where the core interacts with the main structural system. The construction was completed quickly and safely.

Détails du Projet

Développeur:
Samsung C&T Corporation
Entreprise de construction:
Samsung C&T Corporation
Designer structurel:
RISE STRUCTURAL ENGINEERING
Architect:
TAEHWA ENGINEERING CO., LTD (SHOP DESIGN)
Pré-fabricant de béton:
KC INDUSTRY
Année de réalisation:
2023
Année de livraison:
2023

Parlez avec nos experts