Green Day Office Complex, Wrocław, Poland

  • Type de bâtiment:
  • Office Buildings
Plein écran Fermer Street view

The modern office building was built with the use of many ecological solutions and is classified in the LEED certification at the gold level.

More than 1,200 meters of DELTABEAM® Composite Beams based on PCs® hidden corbels were used in the buildings. Additionally, Peikko column connectors and MODIX® rebar couplers were used.

Détails du Projet

Taille du projet:
30,000 m2
Étages:
7
Développeur:
Skanska Property Poland
Entreprise de construction:
Skanska SA
Designer structurel:
GP Konstruktor
Architect:
Maćków Pracownia Projektowa
Pré-fabricant de béton:
Consolis
Année de réalisation:
2012
Année de livraison:
2014

Parlez avec nos experts